
India
William Wootton
The Tidong River
Passos Maia hydropower plant
Passos Maia hydropower plant is located on the Chapecó river in the state of Santa Catarina.
-
2012Entered into operation
-
25 MWInstalled capacity
-
112 GWhAnnual production
The power plant has a total head of 83m and the powerhouse is equipped with two Francis turbines, which receive water through a 1,415m long tunnel, 5.65m in diameter. The RCC dam is 22m high.

Company | Ownership share |
Statkraft | 50% |
Adami S/A Madeiras | 50% |