
Trondheim district heating facility
Vagnhärad district heating plant
Statkraft's district heating is environmentally friendly and based solely on renewable energy sources and efficient technology.
-
2012Entered into operation
-
9 MWInstalled capacity
-
11.3 GWhAnnual production
A biofuel boiler for burning wood chips produces a base load for the district heating network. There is also a flue gas condenser installed which makes production even more efficient.
If it becomes necessary to stop the biofuel boiler or if the weather turns extremely cold, we have a reserve boiler that can use biofuel or other fuel.
The plant already has a low environmental impact, but we are still working to develop and improve the plant.
The district heating production in Vagnhärad supplies heating to over 100 customer facilities.
Year built: 2012
Percentage renewable: 100%

Company | Ownership share |
Statkraft | 100% |